Artwork is the start. Approval is the control system.

Each stage produces something the next stage can use. Unknowns are narrowed before production, not hidden inside a generic quote.

  1. 1.0

    Brief intake

    Product type, use case, dimensions, quantity range, backing, destination, and the best artwork available.

    Output: a scoped production question
  2. 2.0

    Artwork proof

    Shape, relief, color fields, dimensions, attachment zones, and open decisions are made visible for review.

    Output: a shared visual specification
  3. 3.0

    Pre-production sample

    When the order requires it, a physical sample checkpoint tests the agreed design against the intended product context.

    Output: an approval decision
  4. 4.0

    Production and checks

    Production follows the approved reference. Packaging, labeling, and agreed inspection points remain attached to the order brief.

    Output: finished goods against the approved reference
  5. 5.0

    Delivery and reorder record

    Shipping details and the final approved specification become the starting point for a repeat order or a coordinated product extension.

    Output: delivery plus reusable order context

Huizhou factory · production evidence

Review critical stages in their real factory context

These photographs document tooling preparation, blank handling, and the real workstation environment. They are assigned only to this process page so evidence is not repeated across subpages.
Large steel production molds prepared inside the Huizhou factory workshop
I · Tooling preparationProject tooling staged for production

Tool condition, construction, and project reference are checked before production. The tooling route depends on artwork, dimensions, construction, and quantity.

Workers sorting and handling metal blanks at a factory workbench
II · Blank preparationFormed blanks move into sorting and finishing

Blanks are sorted, excess material is removed, and condition is checked before later surface stages so unsuitable pieces do not continue through the batch.

Two workers operating machining and hand-finishing workstations inside the Huizhou factory
III · Workstation coordinationMachining and hand work connect on the same floor

Different constructions move through different equipment and manual checkpoints. Production requirements stay tied to the approved artwork, dimensions, finish, and batch reference.

A Huizhou production area with a lit workbench, parts bins, and material carts
IV · Floor handlingMaterials, stations, and batch status stay visible

Parts bins, material carts, and dedicated lighting support staged handling. Written order requirements and the approved sample provide the batch-checking reference.

Start at stage 1.

A useful brief can be incomplete. Attach what you have and mark the decisions that need a recommendation.

Build the brief